BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//www.twentythree.net, see addthisevent.com for calendar stuff though//EN
BEGIN:VEVENT
DTSTAMP:20260714T080000Z
STATUS:CONFIRMED
DTSTART:20260714T070000Z
DTEND:20260714T080000Z
SUMMARY:How owners, contractors and government bodies are using AI to de-risk, assure and deliver rail megaprojects
DESCRIPTION:https://webinars.nplan.io/how-owners-contractors-and \n\n***How owners, contractors and government bodies are using AI to \nde-risk, assure and deliver rail megaprojects\n\n****Featuring speakers from Transpennine Route Upgrade, John Holland \nGroup and the Victoria Infrastructure Delivery Authority.\n\n******One AI. Three perspectives. Real detail on what’s actually \nworking.\n\nMajor rail projects overrun on schedule and cost by an average of 45%. \nThe causes are well understood: optimism bias drives overconfident \nforecasts, availability bias pulls attention toward the most visible \nrisks rather than the most critical ones, and strategic \nmisrepresentation can shape plans to satisfy stakeholders rather than \nreflect delivery reality on the ground. Traditional methods have \nstruggled to counter any of this, leaving most organisations reacting \nto problems after they've already materialised.\n\nA growing number of rail organisations are now using AI to flip that \ndynamic, and this webinar is your chance to hear directly from three \nof them about what that actually looks like in practice. We've brought \ntogether leaders from an owner, a Tier 1 contractor, and a government \ndelivery authority–three completely different vantage points on the \nsame multi-billion-pound problem– each using Predictive and Generative \nAI on live programmes right now. Rather than talking in generalities \nabout where AI might be headed, each speaker will go into the \nspecifics: what their implementation actually involved, how it \nevolved, what it took to get it properly adopted, and the measurable \ndifference it's making today.\n\nIn this session, you'll hear how rail delivery leaders are using AI \nto:\n\n-\n\nRun AI-led risk assurance on an as-needed basis with minimal resource, \nkeeping teams ahead of deliverability crises instead of reacting to \nthem after the fact\n\n-\n\nSpot risks before they become issues, drawing on a model trained on \n>750,000 past project schedules\n\n-\n\nStrengthen possession assurance, giving teams the confidence to plan \nand protect critical track access windows without costly last-minute \nsurprises\n\n-\n\nRoll AI-driven risk analysis out from a single team or project to an \nentire contracting organisation, building real buy-in from senior \ndelivery teams along the way\n\n-\n\nUse conversational AI agents to interrogate schedules, run cost \nanalysis, and generate reports and dashboards in minutes rather than \ndays\n\n-\n\nGive oversight and delivery authority teams clearer, faster visibility \ninto complex programmes spread across multiple contractors and \nalliances\n\n*Paul Reichl* - R&D Program Manager, Victorian Infrastructure Delivery \nAuthority (VIDA)\n\nPaul works within VIDA, delivering Victoria's ‘Big Build’: over 200 \nroad and rail projects worth more than A$120bn, including the Level \nCrossing Removal Project, Melbourne Airport Rail, and North East Link. \nWith a PhD and an R&D background, Paul is known for cutting straight \nto the real challenges in how contractors and delivery authorities \nwork together. He's seen first-hand how hard it is for oversight teams \nto keep a handle on programmes delivered through complex alliance \nstructures, and has championed the use of AI agents, as a way for VIDA \nteams to quickly understand what's happening on a project and where to \nfocus their attention.\n\n*Paul Bradley* - Group Manager, Planning, John Holland\n\nPaul holds a central planning leadership role at John Holland, a Tier \n1 contractor working across rail, transport, buildings, and energy in \nAustralia. A former British Army engineer with experience delivering \nprogrammes in both the UK and Australia, Paul has been candid about \nthe limitations of traditional schedule risk analysis (QSRA) and how \nAI-driven tools can speed it up, cut bias, and get teams to action \nfaster. He'll talk through what changed after an early renewal project \nwhere adoption stalled at individual-project level, and how that \nexperience pushed John Holland toward rolling AI-driven risk analysis \nout at an enterprise level, with a case he describes as \nstraightforward: spot issues sooner, act earlier, and avoid the kind \nof costly overruns that have made headlines for the industry before.\n\n*Wes Cadby* - Director of Risk Management, Transpennine Route Upgrade\n\nWes leads risk across TRU, a £14bn rail programme, overseeing risk \nprocesses and alliance-level risk management across the whole project. \nHe brings experience from both rail and nuclear alongside an active \nrole in the UK's wider risk management community. When Wes arrived, \nAI-driven schedule analysis was already in use across the alliances, \nwith West leading the way, but it wasn't yet reaching his own central \nprogramme risk team or the broader programme view. Since relaunching \nthe tool within his central team, usage has grown into embedded \npractice, with AI-led insight now contractualised as part of TRU's \ncritical project planning and a routine part of possession readiness \nreviews. He'll talk through what it took to close that gap, the \nresults it's delivered, and how he's now combining those learnings \nwith what's worked in the West alliance to push adoption out further \nacross the programme.
X-ALT-DESC;FMTTYPE=text/html:<!doctype html><html><body><p><a href='https://webinars.nplan.io/how-owners-contractors-and'>How owners, contractors and government bodies are using AI to de-risk, assure and deliver rail megaprojects</a></p><p><h3>How owners, contractors and government bodies are using AI to de-risk, assure and deliver rail megaprojects</h3><h4>Featuring speakers from Transpennine Route Upgrade, John Holland Group and the Victoria Infrastructure Delivery Authority.</h4><h6>One AI. Three perspectives. Real detail on what’s actually working.</h6><p>Major rail projects overrun on schedule and cost by an average of 45%. The causes are well understood: optimism bias drives overconfident forecasts, availability bias pulls attention toward the most visible risks rather than the most critical ones, and strategic misrepresentation can shape plans to satisfy stakeholders rather than reflect delivery reality on the ground. Traditional methods have struggled to counter any of this, leaving most organisations reacting to problems after they've already materialised.</p><p>A growing number of rail organisations are now using AI to flip that dynamic, and this webinar is your chance to hear directly from three of them about what that actually looks like in practice. We've brought together leaders from an owner, a Tier 1 contractor, and a government delivery authority–three completely different vantage points on the same multi-billion-pound problem– each using Predictive and Generative AI on live programmes right now. Rather than talking in generalities about where AI might be headed, each speaker will go into the specifics: what their implementation actually involved, how it evolved, what it took to get it properly adopted, and the measurable difference it's making today.</p><p>In this session, you'll hear how rail delivery leaders are using AI to:</p><ul><li><p>Run AI-led risk assurance on an as-needed basis with minimal resource, keeping teams ahead of deliverability crises instead of reacting to them after the fact</p></li><li><p>Spot risks before they become issues, drawing on a model trained on &gt;750,000 past project schedules</p></li><li><p>Strengthen possession assurance, giving teams the confidence to plan and protect critical track access windows without costly last-minute surprises</p></li><li><p>Roll AI-driven risk analysis out from a single team or project to an entire contracting organisation, building real buy-in from senior delivery teams along the way</p></li><li><p>Use conversational AI agents to interrogate schedules, run cost analysis, and generate reports and dashboards in minutes rather than days</p></li><li><p>Give oversight and delivery authority teams clearer, faster visibility into complex programmes spread across multiple contractors and alliances</p></li></ul><p><strong>Paul Reichl</strong> - R&amp;D Program Manager, Victorian Infrastructure Delivery Authority (VIDA)</p><p>Paul works within VIDA, delivering Victoria's ‘Big Build’: over 200 road and rail projects worth more than A$120bn, including the Level Crossing Removal Project, Melbourne Airport Rail, and North East Link. With a PhD and an R&amp;D background, Paul is known for cutting straight to the real challenges in how contractors and delivery authorities work together. He's seen first-hand how hard it is for oversight teams to keep a handle on programmes delivered through complex alliance structures, and has championed the use of AI agents, as a way for VIDA teams to quickly understand what's happening on a project and where to focus their attention.</p><p><strong>Paul Bradley</strong> - Group Manager, Planning, John Holland</p><p>Paul holds a central planning leadership role at John Holland, a Tier 1 contractor working across rail, transport, buildings, and energy in Australia. A former British Army engineer with experience delivering programmes in both the UK and Australia, Paul has been candid about the limitations of traditional schedule risk analysis (QSRA) and how AI-driven tools can speed it up, cut bias, and get teams to action faster. He'll talk through what changed after an early renewal project where adoption stalled at individual-project level, and how that experience pushed John Holland toward rolling AI-driven risk analysis out at an enterprise level, with a case he describes as straightforward: spot issues sooner, act earlier, and avoid the kind of costly overruns that have made headlines for the industry before.</p><p><strong>Wes Cadby</strong> - Director of Risk Management, Transpennine Route Upgrade</p><p>Wes leads risk across TRU, a £14bn rail programme, overseeing risk processes and alliance-level risk management across the whole project. He brings experience from both rail and nuclear alongside an active role in the UK's wider risk management community. When Wes arrived, AI-driven schedule analysis was already in use across the alliances, with West leading the way, but it wasn't yet reaching his own central programme risk team or the broader programme view. Since relaunching the tool within his central team, usage has grown into embedded practice, with AI-led insight now contractualised as part of TRU's critical project planning and a routine part of possession readiness reviews. He'll talk through what it took to close that gap, the results it's delivered, and how he's now combining those learnings with what's worked in the West alliance to push adoption out further across the programme.</p><p>&nbsp;</p></p></body></html>
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-PT15M
DESCRIPTION:How owners, contractors and government bodies are using AI to de-risk, assure and deliver rail megaprojects
END:VALARM
END:VEVENT
END:VCALENDAR